SLC Installation

type
Installation
where
TMU SLC Building
context
Site specific Installation
when
Fall 2021
SLC Installation — image 1

This window installation was made in collaboration with the Design + Technology Lab team during the fall of 2021. It was installed at street-level at the Student Learning Centre on Yonge St.